Thursday, 29 June 2017

Diameter Calculation of Sieve Tray Column


This blog is about, the diameter calculations of a sieve tray column.

Software's can give diameter for each stage but to verify on our own,the below Sinnot Procedure will help you in comparing the results.

We may not get the exact match becasue software equations might be much more detailed.

The below procedure help a student on how text book methods are used for comparing the results and where exactly the basic knowledge will help in sizing a distillation column.




In a similar way, diameter is calculated for each stage and the largest diameter will be selected.
If you calculate for other stages the diameters will be different because properties will be different.

Constructing a column with single diameter is cheaper. But how we accommodate the lesser diameter stages, is by simply blocking perforations of a tray so that total openings will reduce which is equivalent to lesser diameter.

Columns with different diameters also in use, but only thing is cost is higher.

In my next blog I will write a blog on pressure drop calculations.

   Approximate Column height is calculated as (Number of stages*Tray Spacing) + (15% of  Number of stages*Tray Spacing).

Questions:
How maximum vapor rate is decided?
This is an initial guess which we need to mention for a coloumn to converge.
What i have done is i have taken a vapor fraction of feed stream and multiplied with feed flow.
Simulator will give slightly different answer. But for hand calculations this value is required so guess value using above procedure.
Topics you may like and will be covered in my future blogs:
Column Height/Number of stages is decided by relative volataility,lesser the value difficult will be separation and higher will be the stages/Height.
Example: C3 splitter, Separation of Xylenes.
Poynting correction factor can be ignored for low or medium pressure situations. This topic will be understood if you know gama-Phi Formulation.


References:
Guidance by Prof KV Rao
Introduction to chemical Engineering Thermodynamics by Smith, Vannes and Abbot.
Mass Transfer operations by Treybal.


Sunday, 18 June 2017

Natural gas Hydrates in brief!

     So hello everyone I have been trying to learn on natural gas hydrates and problems on hydrate formation. So below content is only for academic point of view.

Hydrate formation is the major problem in offshore exploration which leads to flow blockage, loss of circulation and even abandonment of the well. This leads to lot of loss in form of dollars and time. The practical solution for preventing or delaying hydrate formations for a long pipeline subsea network is by adding inhibitors, any chemical which reduces the water potential can be used as an inhibitor but MEOH (Methyl alcohol is a universally accepted chemical inhibitor). Knowing the conditions (Pressure and Temperature) with and without inhibitors will help pipeline designing and pipeline operation. The most common hydrate forms structures (Structure I and Structure II) hydrates will be described.
This study also shows how to dehydrate a wet gas using glycols as a solvent which are generally available in offsite gas plant facilities. Dehydration is a solution for reducing the water content before it is sending to gas transportation.And Pressure has to be maintained with an objective of gas has to be in dew point conditions.

Basic substitute equations for calculating HFT.
·               1934, Hammerschmidt.
·               Makogon correlation.
·               1991, Motiee, 15 parameter T-Explicit Equation.
·               2005, Towler and Mokhatab and
·               Bahadori and Vuthaluru. Etc
In all the cases know the process pressure condition i.e. at what pressure it is transporting and then calculate the temperature.

How to describe Type1 and Type2 Hydrates.
Actually we can easily describe Type I and Type II (or Structure I and Structure II). Based on the below graph.
Graph -->Check Figure2.2

·         Less than 3.8 A it is difficult to form hydrate.
·         If the guest molecule are Ar,Kr,N2,O2 this is Type II.
·         From 4.4 A methane, H2s, Xe, ethane, propane will fall in Type I cages.
·         From 7A no Type I and Type II will form. There is another type called TypeH.


Definition of hydrates:
I am also going through the most common gas hydrate forms. According to Von Stackberg and Muller, each of the structure contains two types of cavities.
·         Structure I consists of 46 water molecules which constitute 2 small pentagonal dodechahedra cavities and six tetrdecahedral large cavities, having 2 opposite hexagonal faces and 12 pentagonal faces.
·         Structure II consists of 136 water molecules comprising  16  small pentagonal dodechahedra cavities and 8 hexadecahedra large cavities, having 4 symmetrically arranged hexagonal faces and 12 pentagonal faces.

The average cavity radiuses of 3 cavities are
3.9 A for pentagonal dodechahedra.
4.3 A for tetrdecahedral.
4.7 A for hexadecahedra.

Basically the reason why gas hydrates will form above the ice point of water is, gases will diffuse in these cavities which will alter the condition of formation of Ice. So this is the reason hydrates will form in ~10C.

References:




·         Empirical expressions for gas hydrate stability law, its volume fraction and mass-density at temperatures 273.15 K to 290.15 KZhengquan Lu1, 2, * and Nabil Sultan1


·         PREDICTION OF GAS-HYDRATE FORMATION CONDITIONS IN PRODUCTION AND SURFACE FACILITIES A Thesis by SHARAREH AMERIPOUR

Saturday, 18 February 2017

GAS PROCESSING PLANT OVERVIEW

Hi All,

So i have contributed to a project on one of the gas processing plant facility where gas is collected from wellheads and transported.

We have got three wellheads,HP Section,IP Section,LP Section, HP Compressor section,LP Compressor section, TEG Gas dehydration,TEG regeneration,Gas metering station,crude metering station and other utilities like fuel gas system,cooling water system,Waste heat recovery system etc.

ESD flow sheeting was done,Graphics were prepared for FOD and mimicked DCS as this was an in house project.


Modelling challenges:
Separation of gas and liquids in separators.
Vapor fractions.
Water-TEG interactions.
Hot oil properties which is used in regeneration section.

Most interesting part is taking a start up when ESD is activated.

We tried three ways of pressurising the system.
1) Using gas trunkline system. Which act like a source and sink.
2) Using fuel gas system- note here we have to completely change the model as reverse line has to be defined for doing this which was not considered during modeling phase.
3) Creating a hose connection near HP separator for Fuel gas.

The process looks easy but taking a startup with ESD activated is not that easy.

There will be many facilities available in offsite gas plant like desalter, Amine treating and regeneration systems, there will be compressor train in transportation line.Then Liquification.

For example:
All these things need to be done because the shutdown valves at 3 wellheads will not open until the downstream to get some pressure.
Reversible line has to be defined here as well to sense the pressure.




Monday, 13 February 2017

Lead and Lag KPI Indicators

Lead and Lag KPI Indicators.


This is one of the interesting topic for strategic thinkers. I found this skill set in operation mangers,Data Analysts profiles. I feel that this knowledge is necessary to improve our day to day activities as well.

Lag is nothing but "outputs".Which is easy to measure.

E.g1: CEOs talk in the form of outputs like the target for 2017 Quarter 1 should be say 10Bn$.
E.g2: Production has to be increased to 1000 MTPD(Metric Ton per day)
E.g3: Gasoline and Diesel production has to be increased.
E.g4: Reduce Solvent cost.

Ideally these Lag parameters are easy to identify and easy to say.

Lead is "manipulators/Influence rs" to get that desired "outputs" Which is very difficult to measure.

Identifying these manipulators are very difficult. In a nutshell for the same examples listed above will have many ways to achieve the targets. and you know it is very difficult too.

Lets try for identifying Lead manipulators/influencers to get the desired outputs.

E.g1: Increase hiring the skilled resources. - But do they really work after hiring?
E.g2: Increase imports of raw materials. - Does our capacity handles it?
E.g3: Increase the efficiency of desalter. - Does this is the only indicator?
E.g4: Decrease the solvent flow and invest on construction of new regeneration plant. - Does it really feasible in cost point of view.

The above one is the first set of Lead indicators if we dig down further there will be very few that actually improves the outputs.

It also depends on how much investments has to be spent to get the desired outputs. Few may not interest in actually investing in new things and improve using the available resources or available Facilities.

If we drill down the management pyramid the objectives of top to bottom level will differ to get the desired output.




Tuesday, 31 January 2017

"Operations Management" the new focus in service sector to improve efficiency

Operations Management can be defined as the conversion of inputs 6Ms in to productions of outputs through a transformation process.
Output may be goods produced or services rendered.
If output is goods then it is called production.
6Ms are like men,machines,materials,money,methods and management.


Operation management is a visible face of any company:
This function actually produce the goods and services, it typically involves the greatest bulk of the companies employees and is responsible for a large portion of the firms assets. it has a major impact on the "quality" of goods and cost of production.

It plays a vital role in achieving a firms strategic plans or goals.

Operation management or Production is a primary business function along with marketing and finance,HRD, and material management.


Example to understand better:

HDFC Bank cuts 4,581 jobs in third quarter because of improved efficiency

The bank, which reported its slowest profit growth ever at 15% for the December quarter, saw total headcount reduce to 90,421 as against 95,002 in 30 September 2016
http://www.livemint.com/Industry/ufExTeD1KbYtGjmsj0RWrN/HDFC-Bank-cuts-4581-jobs-in-third-quarter-because-of-improv.html

Another link where operation managers in HDFC are focusing more on M called"Machines"
http://trak.in/tags/business/2017/01/30/hdfc-bank-automation-humanoid-ira/

Scope of Operation management or Production management:
Designing and controlling.

  • Activities related to designing or formulation of the production system.
  • Activities related to analyzing and controlling of production operation after the production system has been activated.

Wednesday, 10 August 2016

DCS and ESD Marshaling for OTS Projects

DCS and ESD Marshaling for OTS Projects!

So Hello once again let us discuss about DCS(Distributed Control System) and ESD(Emergency Shutdown System) Marshaling with Dynamic models.

Please note this topic is only for OTS projects means it wont have marshaling cabinets and no need to go to plant site for testing whether marshaling is done properly or not.

This is the phase which is very important during FAT(Factory Acceptance test) and SAT(Site Acceptance Test) for OTS Projects!

For Yokogawa projects we use CENTUM VP for DCS and ProSafe for ESD.

What Exactly marshaling person has to take care of and what are all the prerequisites to do so.

  • Able to identify DCS and ESD transmitters in P&ID, transmitters like temperature,pressure,flow,pressure differential and level.
  • Able to Understand the types of motor operated equipment's like Pumps,Aircoolers,conveyors,fans,motor operated valves and understand the typical s.
  • Able to understand the typical s of valves like shut off valves,hand valves,KV valves etc eg open limiting switch,Close limiting switch and output.
  • Able to locate DCS and ESD databases and extract right tags from database for a given project.
  • Able to understand the HMI(Human machine Interface of DCS) and its features.
  • Able to understand Logic charts to know the signals of incoming and outgoing.



Monday, 28 December 2015

Law of Diminishing Marginal utility in chemical engineering way


Utility means satisfaction by consuming goods or service or something else. An imaginary number or cardinal approach which is used to measure the satisfaction is called "util"

Utility can be seen in commodity angle and also from consumer angle but let us restrict the topic to above definition and continue.

Law of Diminishing marginal utility:

If you model a first column it will give you more satisfaction if you model the same model again and again and again by keeping other models like compressors in constant your total satisfaction will increase but marginal utility will decrease. so this is called marginal utility in chemical engineering way.

some equations if you want to see in graphical way Mu=DelTu/DelQ
Tu->Total Utility
Mu->Marginal Utility
Q->Change


so model compressor also in between so that you can consume different goods and you will get more satisfied.

---------------------------------------------------------------------------------------------------------------------
What a crap- If someone find the above content is this then i agree 100% YES it is a crap.
I am continuing the blog with out editing the above content as i find some mistakes in it and what i feel is mistakes are GOOD.Another reason is i am not an economist yet.

Basically as a consumer means in above example modelling engineer finds column and compressors as a big things in modelling point of view so there are some "assumptions" in Law of diminishing marginal utility i.e 1) The unit of consumer good may not hold if the unit is too big or too small. so in this case we cannot consider a "valve" as it is very small and "column/compressor" as it is too big in modelling point of view. Read the above statement considering Exchanger or a Pump instead of column which will give better understanding of law.
2) Mental condition of the consumer  must remain normal - There should not be additional pressures means you know how corporate runs.
3) There must be continuity in consumption where a break in continuity is necessary.
4) The consumer taste or preference must remain the same during the period of consumption.


CPP- Co generation Power Plant

CPP- Co-generation Power Plant. I spent some good amount of time in Thermal Power Plants.I will try to give you a brief idea on the same....